HOME / Our Shower Floor Process

Two Days, Six Steps

From first knock to flow-tested handoff.

Floor jobs are compact but unforgiving — slope errors and membrane shortcuts show up as leaks, not looks. Every Bristol floor follows six steps with hold-points you can inspect: after removal (see the substrate), after waterproofing (see the membrane + flood test), and at handoff (flow test + walkthrough). No step gets buried before you can check it.

Bristol notes

In Bristol most floors run a day and a half door-to-door: Bristol's capes have the smallest shower floors in the footprint — a one-day re-tile that transforms the whole bath. Shower again 24 hours after grout — we'll time it to the hour, not the day.

  1. Diagnose. Moisture map, pan assessment, fixed written quote — free.
  2. Remove. Floor out to a clean wall line; walls, glass protected.
  3. Rebuild base. Slope verified or re-poured; membrane + clamped drain.
  4. Flood test. Pan proven watertight before a single tile is set.
  5. Tile & grout. Full-coverage set, epoxy grout, sealed transitions.
  6. Flow test & walkthrough. Drain proven, punch-listed, care guide in hand.
Materials

The Bristol floor sequence

What goes under Bristol feet: the shortlist we install and warranty.

2x2 porcelain mosaic

The workhorse — grippy, cheap, perfect.

Penny rounds

Vintage grip, endless joints.

Pebble sheets

Spa texture, expert grout.

Small-format rects

Modern lines that turn slope.

FAQ

Common questions

Day-by-day, what happens?
Day one: remove, rebuild base, waterproof, flood test. Day two: tile, grout, detail, flow test, walkthrough. Single-day compressions for simple re-tiles.
Dust and noise?
Removal morning is the loud half-day; the rest is quiet hand work with barriers and daily cleanup. Condos and occupied homes are routine for us.
When can I shower?
24 hours after grout — timed to the hour at walkthrough, based on products used and your ventilation.
Who hauls debris?
We do — old tile, mud bed chunks, packaging. Your curb stays clean.